PA26/01496

Status: Granted (09 Apr 2026)
Application Details
Description

National Grid are proposing to upgrade an existing overhead line between poles 43H85 to 43HJ15 and 43HJ15 to 43HJA5 near Penlan Services, Four Winds, Bodmin, Cornwall, PL30 4HH and as per the plans attached. These works are necessary to make the electricity network 3 phase compatible which will provide customers with 3 phase connection to our distribution network. The overhead line route is approximately 1.7 kilometres in length and the main scope of the works will be to install a 3rd wire with the necessary additional fixtures and fittings to support the new line. The new line will attach to insulators on the cross arms of the existing poles and will be in between the two existing outer wires meaning that the visual impact of this additional 3rd wire is considered very minimal. This section of line was refurbished several years ago so it is anticipated that most of the poles will not require any changes however our team will inspect each pole before works commence and if any poles are identified to require replacement this will be done on a like for like basis with the landowners consent and ensuring the old apparatus is dismantled and removed from site. On pole 43HJ15 it will require an out of balance stay to be added to it, this is to keep the pole upright and balanced once the additional wire is installed. I have attached a street view plan showing the works area extents and a network plan showing the line to be included in these works all highlighted yellow

Council

Cornwall

Application Type

Overhead Electricity Lines

Date Validated

04 Mar 2026

Decision Date

09 Apr 2026

Location
Address

Near Penlan Services Blisland Bodmin Cornwall PL30 4HH

Postcode

PL30 4HH

Coordinates

50.509806767434860, -4.662708287783577

Source: Lat and Lng

Quick Info
UID
PA26/01496
Reference
PA26/01496
Status
Granted
Last Updated
12 Apr 2026