PA25/00883
Application Details
Description
Proposed upgrading of the existing overhead network to three phase to facilitate the augmentation of an existing connection. This will require a third wire to be erected on the high voltage line for one span from pole 43AE26 to 43EA26A, highlighted in yellow on the plan 5359589SECT37 design plan. There will also be a requirement to stand a lazy leg pole beside pole 43EA26A to support the larger three phase pole mounted transformer. The existing low voltage conductor 2C 95 ABC will need to be upgraded to 4C 95 ABC, highlighted in green on the plan. Pole 43-4026-3 will be repositioned on the land owners boundary. The existing pole and remainder of the conductor will be dismantled as shown by the blue.
Council
Cornwall
Application Type
Overhead Electricity Lines
Date Validated
04 Feb 2025
Decision Date
28 Feb 2025
Council Website
View on Cornwall websiteLocation
Address
Carne Hill Trewoon St Austell Cornwall PL25 5TJ
Postcode
PL25 5TJ
Coordinates
50.345661191942540, -4.828737760716521
Source: Lat and Lng
Quick Info
- UID
- PA25/00883
- Reference
- PA25/00883
- Status
- Granted
- Last Updated
- 03 Mar 2025