PA25/00338
Application Details
Description
- Add a 3rd wire to HV network from pole 43JF12 to 43JF17- Add a 3rd wire to HV network from pole 43JF17 to 43JF17C- Add a 3rd wire to HV network from pole 43JF17 to 43JF36 and replace existing outer conductors with 25mm HDC- Add a 3rd wire to HV network from pole 43JF36 to 43JFC6- Add a 3rd wire to HV network from pole 43JF36 to 43JF44- Add a 3rd wire to HV network from pole 43JF40 to 43JFD8 (inclusive of 43JFD1)- Install a lazy leg pole next to 43JFC6 for new 200kVA pole mounted transformer at Hamatethy -Pole replacements in various locations along existing line routes as shown on attached plan. In total 27 poles out of the 48 poles will require replacement.-Works within the SSSI and SAC are required and a separate assent has been granted for those works by Natural England. NGED have produced a HRA document due to the works in the SAC area. -Tree trimming works required to provide adequate clearance from trees to the overhead lines in the spans between poles 43JF17 and 43JF21.
Council
Cornwall
Application Type
Overhead Electricity Lines
Date Validated
16 Jan 2025
Decision Date
14 Feb 2025
Council Website
View on Cornwall websiteLocation
Address
Street Record St Breward Bodmin Cornwall
UPRN
Coordinates
50.571430600000000, -4.677299300000000
Source: Application UPRN
Quick Info
- UID
- PA25/00338
- Reference
- PA25/00338
- Status
- Granted
- Last Updated
- 16 Feb 2025