Cambridgeshire - 2026
54 planning applications validated in 2026
54
Total
42
Granted
0
Refused
All Applications
| Reference | Address | Description | Status | Date Validated |
|---|---|---|---|---|
| CCC/26/070/VAR | Littleport Community Primary School, Parsons Lane, Littleport, Ely, Cambridgeshire, CB6 … | Extension to school, extension to car park, widening of access, two sheds, two bicycle shelters, … | Granted | 28 May 2026 |
| CCC/26/048/FUL | Yard North Of Datashredders Unit 2, Eastwood End Industrial Estate, … | Change of use of existing yard to open storage of palletised and baled waste material … | Granted | 27 May 2026 |
| CCC/26/075/VAR | Block 19 Ida Darwin Site, Fulbourn, Cambridge, CB21 5EE | Erection of 5 bay modular building for use as a staff room and offices for … | Granted | 26 May 2026 |
| CCC/26/073/NMW | Grunty Fen Landfill Pools Road Witchford Cambridgeshire CB6 2JE | Non-material amendment to amend the description of development in E/03002/09/CW to: Section 73 application to … | Granted | 19 May 2026 |
| CCC/26/074/DOR | Medworth Efw Chp Facility, 40 Algores Way, Wisbech, Cambridgeshire, PE13 … | Application to Discharge Requirement 8 (part discharge) of the Medworth EfW CHP DCO; Operational Drainage … | Granted | 18 May 2026 |
| CCC/26/071/DCON | Deneia (The Primary School Site, Key Phase 1), Waterbeach New … | Application for the discharge of Conditions 13 (Bird/Bat Boxes), 19 (Cycle ad Scooter Parking) and … | Granted | 18 May 2026 |
| CCC/26/064/FUL | Fowlmere Primary School, Butts Lane, Fowlmere, Royston, Cambridgeshire, SG8 7SL | Erection of new and replacement boundary fencing and gates, and installation of entry control system | Granted | 15 May 2026 |
| CCC/26/060/NMW | 362 Wisbech Road Westry Cambridgeshire PE15 0BA | Non-material amendment affecting condition 2 of planning permission F/2002/15/CW (Anaerobic digestion facility) (as amended by … | Granted | 12 May 2026 |
| CCC/26/058/VAR | New Saxon Works, Peterborough Road, Whittlesey, Peterborough, PE7 1PD | Section 73A planning application to continue the importation of controlled inert wastes for the buttressing, … | Pending | 12 May 2026 |
| CCC/26/068/DOR | Medworth Efw Chp Facility, 40 Algores Way, Wisbech, Cambridgeshire, PE13 … | Application to Discharge Requirement 4 (part discharge) of the Medworth EfW CHP DCO; Landscape and … | Granted | 06 May 2026 |
| CCC/26/065/DCON | Envar Ltd, St Ives Road, Woodhurst, Huntingdon, Cambridgeshire, PE28 3BS | Application to discharge conditions 9 (Construction environmental management plan), 12 (Construction drainage), 29 (Surface water … | Pending | 06 May 2026 |
| CCC/26/067/DOR | Medworth Efw Chp Facility, 40 Algores Way, Wisbech, Cambridgeshire, PE13 … | Application to Discharge Requirement 8 and 10 (part discharge) of the Medworth EfW CHP DCO; … | Granted | 05 May 2026 |
| CCC/25/091/FUL | Land between Church Road/Loverose Wy and Orchard Street in Stow-cum-Quy, … | Creation of Swaffhams Greenway multi-user route with new paths and improvements to existing paths for … | Pending | 05 May 2026 |
| CCC/26/037/NMW | Needingworth Quarry Bluntisham Road Needingworth PE27 4TA | Non-material amendment to the site phasing of working plan and restoration scheme affecting planning conditions … | Granted | 28 Apr 2026 |
| CCC/26/043/FUL | Eynesbury C Of E (controlled) School, Montagu Street, Eynesbury, St … | Installation of roof edge protection guardrail barriers. Increase the roof height and overlay the flat … | Granted | 27 Apr 2026 |
| CCC/26/049/FUL | Melbourn Primary School , Mortlock Street, Melbourn, Cambridgeshire, SG8 6DB | Erection of a temporary modular classroom building, fencing and associated works, including service cabling, and … | Pending | 27 Apr 2026 |
| CCC/25/099/FUL | Land At 254A And 254 Histon Road, Cottenham, Cambridge, CB24 … | Improvements and extension to waste recycling facility, including demolition of dwelling and change of use … | Pending | 24 Apr 2026 |
| CCC/26/061/DOR | Medworth Efw Chp Facility, 40 Algores Way, Wisbech, Cambridgeshire, PE13 … | Application to Discharge Requirement 7(1) (part discharge) of the Medworth EfW CHP DCO; Highway Arrangements … | Granted | 24 Apr 2026 |
| CCC/26/062/DOR | Medworth Efw Chp Facility, 40 Algores Way, Wisbech, Cambridgeshire, PE13 … | Application to Discharge Requirement 9 (part discharge) of the Medworth EfW CHP DCO; Contamination and … | Granted | 24 Apr 2026 |
| CCC/26/035/DCON | Willingham Primary School Thodays Close Willingham Cambridge Cambridgeshire CB24 5LE | Application to discharge condition 7 (Solar Panels) of planning permission CCC/24/107/FUL. | Granted | 23 Apr 2026 |
| CCC/26/057/DCON | New Saxon Works Peterborough Road Whittlesey Peterborough PE7 1PD | Application to discharge condition 30 (Site liaison group) of planning permission CCC/24/078/FUL (Importation of controlled … | Granted | 23 Apr 2026 |
| CCC/26/059/DOR | Medworth Efw Chp Facility 40 Algores Way Wisbech Cambridgeshire PE13 … | Application to Discharge Requirement 11 (part discharge) of the Medworth EfW CHP DCO; Construction Traffic … | Granted | 23 Apr 2026 |
| CCC/26/016/VAR | Wisbech Adventure Playground, Waterlees Road, Wisbech, Cambridgeshire, PE13 3HB | Demolition of existing structures and erection of new building to house youth facilities. Informative: This … | Granted | 21 Apr 2026 |
| CCC/26/054/APP | Land At The Junction Of Goslings Drove And Two Pole … | Appeal against service of enforcement notice for change of use from agriculture to a use … | Pending | 20 Apr 2026 |
| CCC/26/052/DCON | Barrington Quarry, Haslingfield Road, Barrington, CB22 7RQ | Application to re-discharge condition 50 (Surface water drainage) of planning permission S/0204/16/CW (Importation by rail … | Pending | 15 Apr 2026 |
| CCC/26/040/NMW | March Landfill Site, Hundred Road, March, Cambridgeshire | Non-material amendment affecting conditions 2, 5, 8, 9 and 10 of planning permission CCC/22/101/FUL to … | Granted | 08 Apr 2026 |
| CCC/26/024/FUL | Colville Primary School Colville Road Cambridge CB1 9EJ | Installation of roof edge protection barriers. | Granted | 07 Apr 2026 |
| CCC/26/033/FUL | Milton Household Waste Recycling Centre, Butt Lane, Milton, Cambridge, Cambridgeshire, … | Erection of canopies to cover the recycling containers | Granted | 07 Apr 2026 |
| CCC/26/042/VAR | Priory Junior School Longsands Road St Neots Cambridgeshire PE19 1TF | Retention of a 7 bay mobile classroom unit for a temporary periodInformative: This Section 73 … | Granted | 31 Mar 2026 |
| CCC/26/034/DCON | Land Adjacent To Milton Household Waste Recycling Centre, Butt Lane, … | Application to discharge condition 4 (Surface Water Drainage) and condition 10 (Lighting) of planning permission … | Granted | 30 Mar 2026 |
| CCC/26/039/DCON | Household Waste And Recycling Centre Hundred Road March Cambridgeshire PE15 … | Application to discharge condition 6 (drainage) of planning permission CCC/22/101/FUL (new March Household Recycling Centre) | Granted | 24 Mar 2026 |
| CCC/26/038/FUL | Household Waste And Recycling Centre, Hundred Road, March, Cambridgeshire, PE15 … | Erection of canopies to cover the recycling containers and associated works | Granted | 23 Mar 2026 |
| CCC/26/036/DCON | Littleport Community Primary School Parsons Lane Littleport Ely Cambridgeshire CB6 … | Application to discharge condition 18 (Travel Plan) of planning permission CCC/23/137/FUL | Granted | 19 Mar 2026 |
| CCC/26/007/FUL | Land between Ada Lovelace Rd & M11, Cambridge. Along Whitwell … | Creation of Comberton Greenway multi-user route with new paths and improvements to existing paths for … | Pending | 14 Mar 2026 |
| CCC/26/026/VAR | Station Quarry , Station Road, Odsey, Cambridgeshire, SG7 5RT | Extraction of chalk and restoration to a beneficial afteruse at Station Quarry, Steeple Morden (Steeple … | Pending | 13 Mar 2026 |
| CCC/26/027/VAR | Station Quarry , Station Road, Odsey, Cambridgeshire, SG7 5RT | Extension of quarry for the extraction of chalk, and restoration to chalk grassland and woodland … | Pending | 13 Mar 2026 |
| CCC/26/025/DCON | Plantation Quarry Station Road Steeple Morden Royston Cambridgeshire SG8 0NX | Application to discharge national mandatory conditions relating to Biodiversity Net Gain Plan and Habitat Management … | Granted | 11 Mar 2026 |
| CCC/26/030/DCON | Willow Hall Farm Hillrow Causeway Haddenham Ely Cambridgeshire CB6 3PA | Application for the re-discharge of the approved details for condition 12 (Construction Environmental Management Plan) … | Granted | 04 Mar 2026 |
| CCC/26/028/FUL | Sawtry Junior Academy, Middlefield Road, Sawtry, Huntingdon, Cambridgeshire, PE28 5SH | Erection of 7-bay mobile classroom for a temporary period. | Granted | 27 Feb 2026 |
| CCC/26/021/VAR | Sawtry Junior School, Middlefield Road, Sawtry, Huntingdon, Cambridgeshire, PE28 5SH | Retention of a 7-bay modular classroom building for a temporary period. Informative: This Section 73 … | Granted | 19 Feb 2026 |
| CCC/26/020/DCON | Mick George Mitchell Hill Long Drove Cottenham Cambridgeshire CB24 8RR | Application to discharge condition 26 (surface water drainage) of planning permission S/0088/18/CM. | Granted | 18 Feb 2026 |
| CCC/26/017/DCON | Alconbury Weald Education Campus) Ermine Street Alconbury Weald Cambridgeshire PE28 … | Application for the discharge of Condition 29 (Foul and Surface Water Drainage Phase 1) of … | Granted | 14 Feb 2026 |
| CCC/26/006/DCON | Saxon Works Peterborough Road Whittlesey Peterborough PE7 1PJ | Application to discharge condition 24 (Site liaison group) of planning permission CCC/24/048/FUL (Metal Recycling Facility … | Granted | 11 Feb 2026 |
| CCC/26/011/DCON | Alconbury Weald Education Campus, Ermine Street, Alconbury Weald, Cambridgeshire, PE28 … | Application for the discharge of Conditions 17 (Grassed Areas Enhancement Phase 1) and 37A (Fire … | Pending | 05 Feb 2026 |
| CCC/26/012/DCON | Alconbury Weald Education Campus Ermine Street Alconbury Weald Cambridgeshire PE28 … | Application for the discharge of Conditions 10 (Floodlighting All Phases), 35 (Artificial Pitch Specification) and … | Granted | 04 Feb 2026 |
| CCC/26/013/DCON | Samuel Pepys School Cromwell Road Eynesbury St Neots Cambridgeshire PE19 … | Application to discharge condition 7 (Transport - travel plan) of planning permission CCC/22/107/FUL | Granted | 04 Feb 2026 |
| CCC/26/010/DCON | Alconbury Weald Education Campus Ermine Street Alconbury Weald Cambridgeshire PE28 … | Application for the discharge of Condition 22 (Secondary School External Materials Phase 1), and the … | Granted | 04 Feb 2026 |
| CCC/26/008/DCON | Samuel Pepys School Cromwell Road Eynesbury St Neots Cambridgeshire PE19 … | Application to discharge condition 18 (BREEAM Pre-Construction) and 19 (BREEAM Post-Construction Review) of planning permission … | Granted | 30 Jan 2026 |
| CCC/25/140/FUL | Burwell Lode Bridge Site , South Of The Junction Of … | Construction of a bridge over Burwell Lode for pedestrians and cyclists, including associated approach ramps … | Pending | 26 Jan 2026 |
| CCC/26/005/DCON | Deneia (The Primary School Site, Key Phase 1) Waterbeach New … | Application for the discharge of Condition 4 (External Materials) of Planning Permission CCC/25/076/FUL. | Granted | 20 Jan 2026 |
| CCC/26/004/DCON | Deneia (The Primary School Site, Key Phase 1) Waterbeach New … | Application for the discharge of Conditions 5 (Hard and Soft Landscaping / Tree Strategy) and … | Granted | 20 Jan 2026 |
| CCC/26/003/DCON | Godmanchester Landfill Cow Lane Godmanchester Cambridgeshire PE29 2EJ | Planning application to discharge Condition 13 Construction Environmental Management Plan (CEMP) of permission CCC/21/236/VAR. | Granted | 16 Jan 2026 |
| CCC/26/001/NMA | Willingham Primary School Thodays Close Willingham Cambridge Cambridgeshire CB24 5LE | Non-material amendment to planning permission CCC/24/107/FUL to amend the number and position of the windows … | Granted | 13 Jan 2026 |
| CCC/25/148/DCON | Kennett Primary School 98 Station Road Kennett Newmarket Cambridgeshire CB8 … | Discharge of condition application for Condition 16 (BREEAM Post-Construction Certificate) of planning permission CCC/22/138/FUL. | Granted | 05 Jan 2026 |