26/0107/COND

Status: Granted (17 Apr 2026)
Application Details
Description

Discharge condition 25 (Hydrogeological) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

Council

Caerphilly

Application Type

Condition Discharge

Date Received

13 Feb 2026

Date Validated

16 Feb 2026

Decision Date

17 Apr 2026

Location
Address

Twyn Hywel Energy Park Land North-West Of Caerphilly

Quick Info
UID
26/0107/COND
Reference
26/0107/COND
Status
Granted
Last Updated
19 Apr 2026