25/0342/NCC

Status: Granted (14 Nov 2025)
Application Details
Description

Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor

Council

Caerphilly

Application Type

Development without complying with conds

Date Received

29 May 2025

Date Validated

30 May 2025

Decision Date

14 Nov 2025

Location
Address

Twyn Hywel Energy Park Land North-West Of Caerphilly

Coordinates

51.625448600000000, -3.272356500000000

Source: Application UPRN

Quick Info
UID
25/0342/NCC
Reference
25/0342/NCC
Status
Granted
Last Updated
16 Nov 2025