2023/06670/PA
Status: Granted
(01 Dec 2023)
Application Details
Description
Building works and Earthworks comprising a viaduct extending over the River Rea. The viaduct includes an integral Maintenance Access Point with a double staircase and pedestrian walkway on either side of the viaduct. Earthworks to include an attenuation basin. This is a Plans and Specifications submission made under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017.
Council
Birmingham
Application Type
High Speed Rail (London to West Midlands) Act 2017
Date Received
29 Sep 2023
Date Validated
29 Sep 2023
Decision Date
01 Dec 2023
Council Website
View on Birmingham websiteLocation
Address
Located between Birmingham Museum Collection Centre, passing over the River Rea to a point adjacent east of the West Midlands Signalling Centre
Quick Info
- UID
- 2023/06670/PA
- Reference
- 2023/06670/PA
- Status
- Granted
- Last Updated
- 05 Dec 2023