2023/06670/PA

Status: Granted (01 Dec 2023)
Application Details
Description

Building works and Earthworks comprising a viaduct extending over the River Rea. The viaduct includes an integral Maintenance Access Point with a double staircase and pedestrian walkway on either side of the viaduct. Earthworks to include an attenuation basin. This is a Plans and Specifications submission made under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017.

Council

Birmingham

Application Type

High Speed Rail (London to West Midlands) Act 2017

Date Received

29 Sep 2023

Date Validated

29 Sep 2023

Decision Date

01 Dec 2023

Location
Address

Located between Birmingham Museum Collection Centre, passing over the River Rea to a point adjacent east of the West Midlands Signalling Centre

Quick Info
UID
2023/06670/PA
Reference
2023/06670/PA
Status
Granted
Last Updated
05 Dec 2023