LA06/2024/0498/DC
Application Details
Description
Discharge of conditions 16, 38 and 44 of Planning Approval LA06/2023/1500/F which read: Condition16 - No development, including ground preparation or vegetation clearance, shall take place, with the exception of the establishment of the two site compounds and any archaeological works required under conditions 17 and 18 as shown on phasing drawing No. 58C bearing the date stamp 30 June 2022 and any archaeological works required under conditions 17 and 18 below, until a final Construction and Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Council. This shall reflect all of the mitigation and avoidance measures detailed in the outline CEMP and the Ecological Impact Assessment. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Water Quality Monitoring Plan; e) Environmental Emergency Plan; f) Details of appropriate mitigation measures to protect hedgehogs; g) Details of updated Japanese knotweed surveys to be carried out and any necessary mitigation and/or management measures required; h) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities i) A Construction Event Management Plan and Construction Site Traffic Management Plan. Condition 38 - Prior to the commencement of development, a dust management plan shall be submitted to and agreed in writing by the Council. This shall outline the site-specific dust mitigation measures to be employed during demolition and construction phases to minimise the generation and movement of dust from the proposed development to surrounding areas. Condition 44 - Prior to the commencement of any works on site with the exception of the establishment of the two site compounds as shown on Drawing No. 58C bearing the date stamp 30 June 2022 and any archaeological works required under conditions 17 and 18 above, an inspection shall be undertaken to review the site conditions and the potential for any re-occurrence of Japanese knotweed. If Japanese knotweed or other invasive species are found, necessary action shall be taken prior to works commencing on site. Details of these inspections and any action required shall be included in the final Construction Environmental Management Plan (CEMP) referred to in condition16 above. The development shall be carried out in accordance with the approved details.
Council
Ards North Down
Application Type
Discharge of Condition
Date Received
06 Jun 2024
Date Validated
11 Jun 2024
Decision Date
24 Sep 2024
Council Website
View on Ards North Down websiteLocation
Address
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock
Coordinates
54.662611111543356, -5.669930919927586
Source: Lat and Lng
Quick Info
- UID
- 688488
- Reference
- LA06/2024/0498/DC
- Status
- Granted
- Last Updated
- 03 Oct 2024