AVA/2024/0540

Status: Pending (01 Jan 0001)
Application Details
Description

Construction of a cycleway/multi-user trail, as part of the Derwent Valley Cycleway, on existing or reconfigured Rights of Way, from Chevin road in the south to Bridge Foot in the north. The trail will be constructed to Sustrans standards, implying a 3 m wide tarmac pathway, of appropriate colouring. As the route is on the flood plain alongside the River Derwent, it will be flood tolerant. With agreement with landowners or tenants, various gateways between fields will be reconfigured, to allow for easy movement of user traffic, while retaining control of motor vehicle movement or farm animals. (Departure from the Local Plan, and may affect public right of way, the setting of a listed building, the setting of the Conservation Area and its setting, the openness of the green belt and may adversely impact significance of the World Heritage Site and its setting)

Council

Amber Valley

Date Received

29 Jul 2024

Date Validated

17 Sep 2024

Decision Date

01 Jan 0001

Location
Address

Derwent Valley Cycleway From Chevin Road To Bridge Foot Chevin Road Belper Derbyshire

Coordinates

53.029729072767687, -1.487463804869885

Source: Application Form

Quick Info
UID
AVA/2024/0540
Reference
AVA/2024/0540
Status
Pending
Last Updated
14 Nov 2025